Military Operations Urban Terrain (MOUT) Phase I
Fort Irwin, CA
Design-Build
New Construction
$11.8 million
The project consists of over 50 structures arranged to simulate an urban environment with the objective for military training (includes a consulate building, government building both surrounded by guard towers with barrier walls and urban area). RQC developed a very innovative design for this MOUT that allowed this project to be delivered within the limited budget and tight schedule requirements.
“RQC did an outstanding job constructing this very important, high visibility project for Fort Irwin and the National Training Center. The project was very difficult and challenging from the beginning due to the its location in the middle of the desert at a remote US Army training center. RQC was forced to develop innovative solution to complex problems due to the nature of the project.” |