Replace Fuel Pier and Replace Truck Load Facility, Cuba
The project required our project team to demolish the existing pier and replace it with a concrete fuel pier, fender piles, mooring dolphins, control building, and ramp to transition from the pier to the shore. The project includes fuel piping, ship hose service with spill containment, the road leading to the pier, telephone, fire alarm and suppression systems, oily water collection system, and construction dredging. A booster pump/storage tanks and replacement of the truck load facility will be included as options to the contract to be exercised if financially feasible.
CA HEADQUARTERS
1620 Faraday Avenue
Carlsbad, CA 92008 760.631.7707 Directions
CA HOURS
Mon – Fri : 8am - 4:30pm
Sat - Sun : Closed
Contact Us
(760) 631-7707
NC OFFICE
CTR133 Julian C. Smith St.
Camp LeJeune, NC 28547 Directions
VA OFFICE
200 Bendix Road, Suite 250
Virginia Beach, VA 23452 Directions
FL OFFICES
12740 Gran Bay Parkway W, Ste 140
Jacksonville, FL 32258 Directions
Logistics: 10832 New Berlin Rd.
Jacksonville, FL 32226 Directions