Replace Waste Drain Pipe

Replace Waste Drain Pipe, Naval Medical Center San Diego, California

This project at the Naval Medical Center in San Diego provided waste drain piping repairs and improvements for the plumbing systems throughout Building 1H of the hospital. As a part of this project, structural design was provided to ensure all piping systems were adequately anchored to the building structure to resist gravity and lateral loads caused by earthquake forces.

Design Build

Contract Type

Naval Medical Center San Diego

Location

RQ

Designer of Record

$23.5M

Project Value

The project was managed and executed in a professional manner while minimizing disruption to the Hospital staff and its operations. Outstanding planning, coordination, flexibility, and management of the project by the Contractor allowed for scheduled durations to be achieved. The project overall produced a much needed quality waste drain and ceiling and lighting systems for the hospital.

Project Final Performance assessment

Connect With Us

Interested in Working With Us? Connect with Our Team to Learn More.

Get in Touch

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.