RQ is pleased to announce that the RQ-URS JV has been awarded the design-build repaving of Sherman Avenue. The objective is to restore and upgrade the current asphalt road with a rigid concrete pavement to further prevent deformation of the driving surface, restore structurally and functionally two culvert road crossings, bring up to code and restore structural integrity of two pedestrian bridges, replace part of the existing working utility lines located beneath the new pavement, and reapply road marking.