Ecolite Wall System Gets Fort Irwin MOUT Project Running in Record Time Published in the Design-Build Dateline September 2008 At Fort Irwin, Calif., the Army needed to build more than 50 buildings as a part of a Military Operations on Urban Terrain (MOUT) facility....
Brian Smith, M.SAME, George Rogers, M.SAME, and Steven H. Miller, M.SAME | Published in The Military Engineer Consider this scenario: You must build a town of more than 50 permanent buildings from the ground up in just seven months. The remote desert location is...
Steven H. Miller | Featured at ConcreteProducts.com A U.S. Army Corps of Engineers (USACE) contract for a 56-building complex in the southern California desert provided the brutal proving ground for Ecolite Concrete’s new wall system. As a building mock-up...