P1048 Electrical Upgrades

P1048 Electrical Upgrades, Marine Corps Base Camp Pendleton, California

This design-build project, performed within a previous Dry Utilities MACC, involved the new construction and renovation of three 12kV metering stations fed from concurrently constructed San Diego Gas & Electric (SDG&E) 12kV substations located in the south, mid, and north areas of Camp Pendleton. These metering substations are referenced as Metering Stations 1, 2, and 3. Additionally, construction included 12kV overhead (approximately 25 miles) and underground (approximately 9 miles) distribution systems feeding all major portions of the Base and providing tie lines between the substations. The metering stations and distribution system that they feed is Base-owned and provides more flexibility, reliability, and cost savings. This project also features exterior lighting systems, SCADA security controls, and grounding systems for the pad-mounted transformers and conductors.

Design Build

Contract Type

Marine Corps Base Camp Pendleton

Location

$38M

Project Value

Connect With Us

Interested in Working With Us? Connect with Our Team to Learn More.

Get in Touch

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.