
MALS-39 Maintenance Hangar, Marine Corps Air Station Camp Pendleton, California
The MALS-39 Aircraft Maintenance Hangar will include a Hangar Bay and an attached two-story administration building with a combined gross area of 37,997 square feet (sf). This area will contain offices, engineering shops, a tool room, operational spaces, stairs and elevator, utility spaces, break and training area and male/female locker/restroom facilities. One paint room and one blast room are located on one side, while a tail boom and composite shop anchors the other side. The hangar will be built on a concrete pile and grade beam foundation with structural steel columns, CMU walls, steel roof trusses, metal wall panels and an insulated PVC roof.
Design Build
Contract Type
Marine Corps Air Station Camp Pendleton
Location
URS
Designer of Record
$19.3M
Project Value
Shop
Classroom
Hangar
Contractor has gone above and beyond to cooperate with government.
Deadlines are met, coordination with all parties is consistent, a partnering attitude is apparent.
