
Solid Waste Facility, Naval Station Guantanamo Bay, Cuba
The P-160 Solid Waste Facility involves the design and construction of a Municipal Solid Waste Landfill, a Solid Waste Management Building (SWM), a Maintenance Building, and a pump house. The goal of this project is to construct a facility that will be capable of managing all solid waste generated at NSGB. The Solid Waste Facility will manage aspects of the base solid waste and recycling needs.
The Facility will consist of the Landfill, leachate ponds, SWM building housing the material recovery facility, existing scales and scale house, stormwater management system, existing Construction and Demolition Debris landfill, existing asbestos disposal area, soil borrow area, Petroleum-Oil-Lubricant drying beds, and septic disposal area.
Design Build
Contract Type
Naval Station Guantanamo Bay
Location
RQ
Designer of Record
$58.8M
Project Value
Management, control, cooperation, and responsiveness were effective. Jobsite and senior leadership demonstrated engagement, timeliness, partnership, demonstrated competence in management of the contract throughout the period of performance.
